Projects & Case Studies

Wetland Maintenance for City of Playford

Urbans team have been engaged by the City of Playford to perform brush cutting and tractor slashing activities to keep the NEXY Basin in tip-top condition. The NEXY Basin has a wetland area of 7000m2.

This is one of seven wetland / ASR (Aquifer Storage & Recovery) and Aquifer Injection sites we currently maintain for the City of Playford.