Projects & Case Studies

Playground Upgrade – Brooklyn Reserve, Hallett Cove

Brooklyn Drive Reserve Upgrade is now on its final stretch to completion. The magnificent tepee tower manufactured by Nature Play Solutions was craned into position thanks to the team at City Crane Trucks. The premade mud kitchen (also made by Nature Play Solutions) was fixed and concreted into place. The turf and planting of trees will be completed to give the final touches to the nature play.

The view from the top of the tepee looking down the valley looks spectacular so be sure to check out this play space located in the City of Marion at Seaway Road, Hallet Cove.